BBIA holds meet, discusses power supply

Spread the love

A meeting of the Members of the Bari Brahmana Industries Association (BBIA) was held today under the chairmanship of Lalit Mahajan president BBIA to discuss the issue regarding the disruption in the power supply to number of units since last 36 Hours due to damage occurred to power infrastructure because of heavy rain and wind storm.
The massive damage was done due to massive growth of Eucalyptus trees along with the power supply Lines inside the complex as the PDD failed to take effective steps for the branch cutting of trees. In last one month, the massive damage was done to the infrastructure of power supply lines and the department has failed to restore the power supply in time due to non availability of requisite spare parts & poles in the complex to replace the damaged infrastructure. The Department is not taking this issue seriously due to which the Industrialists are facing huge financial losses, production losses and machinery breakdown. Even in case of any power break down in the night shift, no one is available to rectify the fault. Industries located in Bari Brahmana are contributing app. Rs. 120 Crores towards the Cost of Power supplied to Industrial Area but the Department is not serious about the Maintenance of regular Power Supply of the Complex due to which the industrial units are suffering very badly.
BBIA appealed Dr Nirmal Kumar Singh, Dy. Chief Minister, Minister for Power Development Department and Chander Parkash, Industries and Commerce Minister with a request kindly to intervene into this matter and issue necessary orders to the concerned officials for the storage of requisite spare parts and poles in the Industrial Complex and also take immediate steps on war footing basis to remove the Eucalyptus trees along with the power supply lines with the consultation of J&K SIDCO for providing uninterrupted power supply to Industrial Sector of Bari Brahmana.

Recommended For You

About the Author: Editorjknews

Facebook