Fresh traffic allowed on J&K highway after clearing stranded vehicles

Fresh traffic was on Sunday allowed from Jammu to Srinagar after all the vehicles, stranded since Thursday, were cleared last night on 270-km-long national highway, connecting Kashmir with rest of the country.
Massive snow clearance operation by Beacon project was going on to clear the 434-km-long Srinagar-Leh highway, which is likely to be open for traffic at the end of this month. The highway, which connects the Union Territory (UT) of Ladakh with Kashmir, remained closed for the past three months due to accumulation of several feet of snow.